Here is the de-watered hole ready for the slide-box to be put in the ground.
Here is the first side of the box being set.
The box after two sides and the first corner piece were set.
Here is the box after three sides and three corners being set.
Here we are setting the final corner of the box.
Setting a piece of the second level.
The finished box with a couple of sections of the wet-well also set.
A completed pond at White Oak Woods, Munster, IN.
Replacing existing 48" metal culvert with dual 48" concrete pipe.
Due to existing utilites, the 48" concrete pipe had to be "bent" to avoid conflicts. Then a concrete collar had to be poured around the joints.
A combination retention/irrigation pond for Golfview Subdivision and Cedar Creek Golf Course in Cedar Lake, IN.
Huntington Cove during an initial stage of further development.
Digging a pond at Huntington Cove.
Digging a pond at Lakewood.
This is the Lakewood pond after some extensive excavating.
The Lakewood pond after being graded and the edge stoned.
Here is the Lakwood pond after the sod was put in and right before completion.
Crossing a road in Joliet.
A road at Watertower after being sub-graded.
Here is the same road at Watertower after being stoned.
Here is the same road at Watertower after being paved.